Link road closures for the coming week
In addition to the ongoing traffic layouts, the A6 between Slyne and Beaumont will have a 24-hour lane closure in place throughout the week, controlled by three-way traffic light signals, to allow for the reinstatement of the A6 carriageway replacing a temporary surface, from Hest Bank Lane south towards the new bridge.
The road will also have a 24-hour lane closure and two-way traffic light signals for drainage works south of the bridge structure near the speed camera from Monday to Friday.
Advertisement
Hide AdAdvertisement
Hide AdHalton Road will have a 24-hour lane closure controlled by two-way traffic light signals for bridge works from Sunday to Friday.
There will be a full closure of Torrisholme Road from Russell Drive to Endsleigh Grove for bridge works on Saturday October 3 from 6am until 8pm.